Some of the most recent work being done on the Shul (243 pictures to date): |
|
Construction Photos Page 4
About Us | Tour | Historic Photos | Construction | Community | Partners | Donate
|






















|
July 7, 2004: Concrete poured into form on roof deck |
July 7, 2004: Protection in place on south deck before concrete pouring |
|
July 1, 2004: Steel base added to south roof deck in preparation for concrete pouring
|
July 1, 2004: Setting wall protection structure in preparation for concrete pouring |
|
June 25, 2004: Preparation of north roof deck for concrete pouring; note slots in brick at left for integration with concrete |
June 25, 2004: Preparation of south roof deck for concrete pouring; note slots in brick at right for integration with concrete |
|
June 25, 2004: Repointed chimney |
June 25, 2004: Striped veneer bricks on east facade becoming delaminated |
|
June 25, 2004: Completing ceiling texturing |
June 25, 2004: Repointed bricks (compare with second to last June 7 photo) |
|
June 17, 2004: New window frame including salvaged hardware |
June 25, 2004: Completing ceiling |
|
June 17, 2004: Repointing bricks on south elevation |
June 17, 2004: Northwest corner of Shul repaired (compare to June 7 photo below)
|
|
June 17, 2004: Mortar injected between bricks as part of repointing process
June 14, 2004: Front window of main building, one of the most character-defining features of the Shul |
June 17, 2004: Mortar to be smoothed with trowel
June 17, 2004: Cleaning joints in preparation for mortar injection |
|
June 7, 2004: New scaffolding to be used for mortar repointing and stained glass window work |
June 14, 2004: Front window of main building, one of the most character-defining features of the Shul |
|
June 7, 2004: Interpretive panel (green) with sample texture panel and plaster, over drywall
Please click here to view more photos
|
June 7, 2004: Drywall smoothed in preparation for plaster
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|